Fairview Fire & EMS — 5-Station Combination System
Demo community · Synthetic data
NFPA 1300 · NFPA 1750 · NFPA 1225 · CPSE/CFAI

Risk, standard, and delivery — one accountable chain.

PRISM builds a fire department's three foundational documents as a single connected system: what the risk is, what response that risk is owed, and whether it was delivered. Each report renders from the previous report's versioned data artifact — no number is hand-entered. Every report below ships in two forms: a live interactive portal and the full written deliverable a governing body can adopt.
Community
Fairview (demo)
Population
34,800
Stations
5
Annual demand
2,410
Composite risk
R 7.5
Objectives met
5 of 13
Suite date
2026-08-04
§ 01 · The report suite

Three reports, each in two forms

The dashboard is the interactive portal — sortable registers, hover maps, drill-down detail. The full report is the complete written deliverable: every section of the production template, formatted for adoption, board packets, and print. Start with Report 1 if this is your first visit — the risk classes it establishes are the direct inputs to everything that follows.
Report 1

Community Risk Assessment

NFPA 1300 · NFPA 1750 §10.3.6

What the community's risk actually is — ten planning zones scored on the PRISM probability × impact model.

  • 10 zones · 1 High, 6 Moderate, 3 Low
  • Seven mandatory NFPA 1300 risk profiles
  • Demographics, SVI, building stock, target hazards
  • Five ranked CRR priorities, each with an owner
  • Full report: 21 sections · 50 pages · v2.1
Report 2

Standards of Cover

NFPA 1750 · NFPA 1225 · CFAI

What response that risk is owed — the adopted objectives and effective response force, sized to Report 1's risk classes.

  • Station-based objectives + demand-zone totals
  • ERF by hazard class, from critical-task analysis
  • Achievability modeled honestly, gaps stated
  • Adoption resolution & measurement conventions
  • Full report: 9 sections + 3 appendices · 17 pages · v1.1
Report 3

Service Delivery Scorecard

CPSE/CFAI · 90th percentile

Whether it was delivered — every adopted objective measured against real incident data, quarterly and annually.

  • 13 adopted measures: objective · measured · gap · n
  • True 90th percentile, never averages
  • Concurrency and overlap-penalty analysis
  • Gap & excess register with adoption triggers
  • Annual edition: CY 2025 · 15 pages · v1.1
▸ Dashboard vs. full report — what's different The dashboards are the working tool: they refresh quarterly and let a chief interrogate the data. The PDFs are the governance artifact: Report 2's PDF carries the adoption instrument and the questions governing bodies ask; Report 3's annual edition adds two things the dashboard does not carry — the gap & excess register and recommendations with adoption-trigger status. Both render from the same hashed data artifact, so the numbers reconcile exactly.
§ 02 · How the chain works

Each report answers one question

Report 1 · CRA
What is the risk?
Report 2 · SOC
What response is it owed?
Report 3 · SDS
Was it delivered?
▸ Why it matters Most departments produce these three documents separately, years apart, from different vendors, with numbers that don't reconcile. PRISM renders them from one versioned dataset, so a risk class set in Report 1 is the same risk class measured in Report 3 — and any gap between the standard and the delivery is visible, quarterly, in public.
§ 03 · What the chain found

The verdict, in public

This is what the loop produces at the end of a year: thirteen adopted measures, each judged against its own zone and risk class. Five met, eight not met. Full detail and the gap register are in the Report 3 annual edition.
Objectives met
5 of 13
incl. all urban + rural totals
Objectives not met
8 of 13
led by daytime ERF
Responses measured
2,410
CY 2025 · 41 excluded, published
Gaps identified
8
G1–G8 · full register
Excess identified
6
E1–E6 · where capacity is idle
Selected measures — CY 2025
Each response judged against its own zone / risk-class objective, then aggregated at the true 90th percentile
MeasureObjectiveMeasured 90th% meetingVerdict
Alarm handling (call answer → dispatch)1:040:5893%Met
Total response — urban zones9:008:1291%Met
Total response — rural zones14:0013:2584%Met
Travel — ALS arrival8:007:1091%Met
Travel — first engine4:005:5558%Not met
Turnout — fire1:201:5268%Not met
ERF assembly — Moderate (28)10:2412:1024%Not met
Cardiac-arrest force (6)10:2411:1561%Not met
▸ The one-line verdict Fairview keeps its end-to-end promise where most people live — urban and rural demand-zone totals met, alarm handling and ALS met — but cannot yet field the force the risk demands when it matters most: Moderate ERF assembles on 24% of qualifying incidents (14% by day). The fix is timing, not headcount: the system that assembles ~34 overnight assembles ~21 by day.
§ 04 · The demo community

Fairview Fire & EMS at a glance

Fairview is a fictional 5-station combination system built to exercise the full method end to end. Every figure in every report is synthetic.
MeasureValueDetail
Population protected34,80028.4 mi² · 19.2% over 65
Planning zones104 urban · 4 suburban · 2 rural
Composite PRISM riskR 7.5Moderate · one High zone (Z-06 Riverbend)
Annual incidents2,41060% EMS · +2.8%/yr
Personnel38 / 82career / active operational volunteers
On-duty career strength724/7 · Stations 1–2
Call concurrency23%calls beginning while units committed
Structures beyond hydrant distance18%2,240 structures · tanker-shuttle operation
⚠ Demo notice Fairview is not a real community. All data is synthetic and generated to illustrate the PRISM method — nothing here should be cited as an operational finding for any department.
PRISM Report Suite — Fairview Fire & EMS (Demo) 2026-08-04 · Demo community · Synthetic data · Powered by IMT